{"componentChunkName":"component---src-templates-post-jsx","path":"/news/little-face-trail-work-","result":{"data":{"prismicPost":{"id":"321ee11c-7f36-5b36-973b-3c6ed494388d","uid":"little-face-trail-work-","type":"post","data":{"title":{"raw":[{"type":"heading1","text":"September 20th Little Face Trail Work ","spans":[],"direction":"ltr"}]},"author":{"document":{"__typename":"PrismicAuthor","data":{"first_name":"Hayley","last_name":"Barnes"}}},"date":"2026-09-20","seo_keywords":null,"seo_description":null,"banner":{"url":"https://images.prismic.io/simbs/6FQSUk2Q9-aElHhl_IMG_5898.jpg?auto=compress%2Cformat&rect=0%2C104%2C1340%2C596&w=1800&h=800&fit=max&q=50","alt":null},"categories":[{"category":{"document":{"__typename":"PrismicBlogPostCategory","uid":"trails","data":{"name":"Trails"}}}}],"body":[{"__typename":"PrismicPostBodyText","slice_type":"text","slice_label":null,"primary":{"anchor":null,"title":{"raw":[{"type":"heading2","text":"September 20th Dig Day","spans":[],"direction":"ltr"}]},"text":{"raw":[{"type":"paragraph","text":"Little Face was built back in 2014 as a two-way blue trail, and in the 12 years since, it hasn’t seen much maintenance beyond some puddle drainage. Twelve years of tires, weather, and wear add up, so it was time to give it some attention.","spans":[],"direction":"ltr"},{"type":"paragraph","text":"Opening up the corners","spans":[{"start":0,"end":22,"type":"strong"}],"direction":"ltr"},{"type":"paragraph","text":"A few of the corners on the climb were originally built on the tight side. The Trail crew pushed them out to give riders more room to work with, then added soil to build the tread back up. ","spans":[],"direction":"ltr"},{"type":"paragraph","text":"Trail conditions","spans":[{"start":0,"end":16,"type":"strong"}],"direction":"ltr"},{"type":"paragraph","text":"It’s extremely dry out there right now. The team hauled water in to help pack things down, but the new work will stay loose until we get some significant rain. Ride it with a little extra care for now, and it’ll settle in nicely once we get some rain. Community is what makes projects like this possible, and every hour you give helps keep our trails rideable for years to come.","spans":[],"direction":"ltr"}]}}},{"__typename":"PrismicPostBodyImageWithCaption","slice_type":"image_with_caption","slice_label":null,"primary":{"image":{"url":"https://images.prismic.io/simbs/xdDTGe2k8VNvgl1l_IMG_5903.jpg?auto=compress%2Cformat&fit=max&q=50","alt":null},"image_caption":{"raw":[]}}},{"__typename":"PrismicPostBodyImageWithCaption","slice_type":"image_with_caption","slice_label":null,"primary":{"image":{"url":"https://images.prismic.io/simbs/0cEy3o2gKz5EIWfM_IMG_5061.webp?auto=compress%2Cformat&fit=max&q=50","alt":null},"image_caption":{"raw":[{"type":"heading3","text":"New berm on left and moss placed over original trail on right","spans":[],"direction":"ltr"}]}}}]}}},"pageContext":{"uid":"little-face-trail-work-"}},"staticQueryHashes":["251305967","525434819","665812761"]}